Bi-kipedia SAP BPC EVDRE builder This tool allows you to quickly create a report by selecting the dimensions you want in the columns and rows, as well as a few more report details. Jeudi, 7 août 2014
Bi-kipedia SAP BPC Expand all The expand all option can be used to regenerate the EVDRE report. It recreates the structure of the report and refreshes the cells. Jeudi, 7 août 2014
Bi-kipedia SAP BPC Fact table A table that contains the transactional data. There are 3 types of tables in the MS version: -FACTWB: real time data storage -FAC2: short term data storage -FACT: long term data storage Jeudi, 7 août 2014
Bi-kipedia SAP BPC Fx conversion Standard BPC logic used to perform the currency conversion. It uses the rates stored in the Rate application and the currency property of the entity to make the calculations. Jeudi, 7 août 2014
Bi-kipedia SAP BPC Getonly range This range is one of the EVDRE ranges. It makes it possible to define which cells a user only wants to retrieve values. The cells are designated as read-only. Jeudi, 7 août 2014
Bi-kipedia SAP BPC Owner/manager Owner/manager are keywords in the context of work status setup. Both are defined by the owner property in the entity dimension. The manager is derived from the child-parent relationship between entities. Jeudi, 7 août 2014
Bi-kipedia Opex - Operational Expenses An operating expense, operating expenditure, operational expense, operational expenditure or OPEX is an ongoing cost for running a product, business, or system. Its counterpart, a capital expenditure (CAPEX), is the cost of developing or providing non-consumable parts for the product or system. Jeudi, 7 août 2014
Bi-kipedia Opex - Operational Expenses An operating expense, operating expenditure, operational expense, operational expenditure or OPEX is an ongoing cost for running a product, business, or system. Its counterpart, a capital expenditure (CAPEX), is the cost of developing or providing non-consumable parts for the product or system. Jeudi, 7 août 2014
Bi-kipedia SAP BPC Optimize application Lite Optimization:-Clears Real-time data storage (WRITEBACK) and moves it to short-term data storage (FAC2). This option doesn't take the system offline, and can be scheduled during normal business activity.Incremental Optimization:-Clears both real-time and Short-term data storage (WB and FAC2) and moves both to Long-term data storage (FACT).-This option should be run when the system is offline, but it will not take the system offline so it should be run during off-peak periods of activity. Jeudi, 7 août 2014
Bi-kipedia SAP BPC Park N Go You can use the Park N Go function to lock the current view in a report / input schedule, or both current view and data, or to take the workbook offline. Jeudi, 7 août 2014